Re Canada Post Corp and CUPW

Document Type

Arbitration Decision

Publication Date

2-8-1997

Keywords

Restructuring, Time, Check, Motorized Routes, Over-Assessed

Abstract

As part of a restructuring, the Employer included an estimated time element for the obtaining, loading and unloading of a vehicle which, according to the Union, had to be subject to a five day check. The Union's contention is that the time values assigned to motorized routes were insufficient and do not include all functions.

Comments

Summary available only on CanLii. Full text available online at Lexis+ (subscription required).

Share

COinS